Project

General

Profile

Project activity #35509

closed

Tezza RM patching documentatie tezza-services

Added by Tahir Malik about 1 month ago. Updated about 1 month ago.

Status:
Resolved
Priority:
P4 Normal
Category:
-
Target version:
Start date:
07/11/2025
Due date:
% Done:

0%

Estimated time:

Description

Ik wil graag documentatie rondom ticket #34984 hebben.

  • Wat doet Alfresco met IPRR en IPRW groepen
  • Waarom hebben we de patch gemaakt
  • Wat doet de patch precies
  • Waar is de link naar de migratie script
  • Hoe kan gecontroleerd worden of de patch klaar is en werkt
Actions #1

Updated by Bram Geerlings about 1 month ago

  • Assignee changed from Bram Geerlings to Tahir Malik
Actions #2

Updated by Bram Geerlings about 1 month ago

  • Status changed from Backlog to Feedback
Actions #3

Updated by Tahir Malik about 1 month ago

  • Assignee changed from Tahir Malik to Bram Geerlings

Akkoord, maar blijven problemen hebben met Documentatie met de gitlab pipelines dus hoe krijgen we dit adoc.

Actions #4

Updated by Bram Geerlings about 1 month ago

  • Status changed from Feedback to Resolved

Also available in: Atom PDF