Project

General

Profile

Project activity #32254

closed

Refactor integratie met Haal Centraal

Added by Diego Mirandola about 2 months ago. Updated about 2 months ago.

Status:
Resolved
Priority:
P4 Normal
Category:
-
Target version:
Start date:
30/05/2025
Due date:
% Done:

100%

Estimated time:

Description

Tezza is afhankelijkheid van module @contezza/haal-centraal. Graag deze module en deze afhankelijkheid refactoren ter voorbereiden van het verplaatsen van Tezza naar de publiek repository.


Related issues 1 (1 open0 closed)

Related to Tezza - Project activity #29896: Tezza apps incl. modules/libraries & code publiekelijk beschikbaar stellenBacklogDiego Mirandola11/11/2024

Actions
Actions #1

Updated by Diego Mirandola about 2 months ago

  • Related to Project activity #29896: Tezza apps incl. modules/libraries & code publiekelijk beschikbaar stellen added
Actions #2

Updated by Diego Mirandola about 2 months ago

  • Description updated (diff)
Actions #4

Updated by Diego Mirandola about 2 months ago

  • Status changed from In Progress to Ready in Dev
  • Assignee changed from Diego Mirandola to Nume Groenewegen
Actions #5

Updated by Diego Mirandola about 2 months ago

  • Target version set to Tezza 2025.06
Actions #6

Updated by Nume Groenewegen about 2 months ago

  • Status changed from Ready in Dev to Test approved
  • Assignee changed from Nume Groenewegen to Diego Mirandola

Getest en werkt zoals beschreven. Kan mee met de release.

Actions #7

Updated by Diego Mirandola about 2 months ago

  • Status changed from Test approved to Resolved
  • % Done changed from 0 to 100

In Contezza apps versie 3.24.0.

Also available in: Atom PDF